PROCESS PLANT SUPPLY

The project was to replace Chinese origin duplex pipe and fittings. These failed after only 8 months after installation. The client was looking for a cost effective solution, and wanted to make sure traceability of material was in place to ensure the quality of the replacement parts.

Shipped from stock:

  • Duplex Pipe Fittings

    Duplex Pipe Fittings

    Quick turnaroud – Time Line immediately despatched project materials held in stock, with the balance to be supplied within a 3-week lead time.

  • Testing & Standards -All material supplied came with EN 10204 3.1 certification to ensure origin and traceability. All of the welded material supplied came with 100% Radiographic Examination, according to ASEM VIII UW 51 test reports.
    These were packed suitable for export (ISPM15).

Maintenance Planning Supervisor

PT Weda Bay Nickel

Time Line International surpassed all expectations and provided the most cost effective package for supply and delivery of the required duplex pipe and fittings. All material was of European origin and manufacture; this was supported by a full documentation pack with the order containing all relevant certificates and test reports. Once on site all of the products were installed immediately as they were received in time for the shutdown, there have been no operational problems since.